The Residences at Franklin
N. Franklin St.
Royal St.
Tampa, Florida 33602, USA
This eight-story condominium project has 40 units (34 of them sold) and sits between N Franklin and N Tampa streets south of Royal (the 1100 block). Construction to be complete in July 2006.
The Arlington
1209 N Franklin St
Tampa, Florida 33602, USA
Eleven flats or lofts upstairs, and ten units downstairs for retail, office, residential, or mixed uses. Expected to open in summer 2006.
Fly
1202 N Franklin St
Tampa, Florida 33602, USA
The owner hopes to bring in local musicians and display works by local artists. Expected to open in summer of 2006.
Skypoint
700 N Tampa St
Tampa, Florida 33602, USA
Seven stories complete. The building will be 32 stories tall and will have 381 units, with ground level retail space. Expected completion: Spring 2007
Wood Partners project
Franklin
Zack
Tampa, Florida 33602, USA
This highrise will be 32 stories, and hold 450-500 units. Demolition of the old Maas Bros building is almost complete (as of Apr 2006). Construction should start shortly.
Trump Tower Tampa
S. Ashley
Tampa, Florida 33602, USA
Trump Tower Tampa will have 192 units, will be 52 stories tall, and should be the tallest residential building on the entire gulf coast when complete. Expected opening: First half of 2007.
Embassy Suites downtown tampa
Platt St.
Florida Av.
Tampa, Florida 33602, USA
Scheduled to open August 1, 2006. The building is 21 stories and holds 373 rooms.
Plaza Harbor Island
Knights Run Av.
Tampa, Florida 33602, USA
Plaza Harbour Island will have 300 units in three phases, the first of which is under construction now. The project includes a mix of townhomes surrounding a 20-story tower. This first tower is expected to be finished in Spring of 2007. The next two towers will be built after the first is finished.
Towers at Channelside
E. Cumberland Av.
S. Meridian
Tampa, Florida 33602, USA
Two towers will each ultimately reach 30 floors and the whole project will have 257 units, along with a large amount of ground floor retail. Expected completion: Spring 2007
The Place at Channelside
Channelside
Whiting
Tampa, Florida 33602, USA
The first phase, an eight-story building, will have about 170 units; this building is up to the fourth floor. To be completed in Spring of 2007.
Ventana
Kennedy
Channelside
Tampa, Florida 33602, USA
Two 10-story towers over a parking garage and retail, with a pool in between. There are 84 units. Should be complete in Summer 2007.
Grand Central at Kennedy
Kennedy
Meridian
Tampa, Florida 33602, USA
Grand Central includes two parcels, east & west. Each piece has an eight story and a 14 story component (they aren’t really separate buildings). There are a total of 392 units, which will be available in Spring 2007.